
For the opening of the ON AIR gym in Bourgoin-Jallieu, we provided the artistic direction of a light path designed around the guests' arrival, leading to a 14-arch LED tunnel.
Light arrows, vertical LED tubes guiding the public, an illuminated façade, then the tunnel as the high point of the arrival, in front of more than a hundred guests.
The structure and façade lighting were delivered with our local partner Technilive; Chronix brought the artistic direction, its LED tubes and its self-contained control cabinets.


Our team replies within 48 working hours.